Our Projects


Baghdad – Police Canal Project

Surveying of the 110 km sewerage pipeline

Sulaymaniyah – Miran Field gas pipeline

length of 53 km and including 3 stations (camp area with all access roads, well pads, and EPF), along with all field design work

Sulaymaniyah – SK gas pipeline

length of 85 km and a 300-meter corridor, including the design of alignment sheets

Mosul – Alghzlaniya project

Surveying of 4700 donum

U.S. CONSULATE GENERAL

Sharawani 2

Kanal4

Trimble DiNi Level

Trimble TX8-3D

LEICA DD230